Fire stopping in Kensington and Chelsea
Big old houses split into flats, with timber floors between them.
- Every seal labelled and photographed
- BM TRADA / FIRAS-certificated contractors
- Written price before any work
Since the Grenfell Tower fire in North Kensington in 2017, few people in this borough need telling why fire safety in blocks of flats matters. Most of what gets talked about is cladding. The work we do is quieter and inside the building: the walls and floors between one home and the next.

Conversions
A lot of the housing here is large Victorian terraces, many with stucco fronts, divided into flats over the last hundred years. The floors between those flats are often timber joists with lath and plaster ceilings below. Over the decades they have been drilled for gas, water, waste, wiring, aerials and broadband.
Typical things we find when a ceiling is opened:
A cast iron soil stack replaced with plastic and the old gap round it left.
Cables run through notches in the joists and up through the floorboards into the flat above.
The space under a bath with a clear view down into the next ceiling void.
Timber floors are sealed differently from concrete ones. The product has to have been tested in a timber floor, and the ceiling below often needs patching to its original thickness before any seal round a pipe will work.
Mansion blocks and basements
Mansion blocks bring shared service ducts that run the full height of the building. Basement extensions bring new plant, new pipes and new holes in old walls.
Before we start
Much of the borough is in conservation areas and many buildings are listed. Opening up a ceiling to look may need the council's permission first, so check with the Royal Borough before a survey that involves cutting.
The sealing is done by our BM TRADA / FIRAS-certificated contractors and each seal is labelled and photographed.
Send the postcode, the type of building and a photo with a tape measure in it. We will come back with what it needs and a rough price.