About us

A small fire safety team. The sealing is done by our certificated contractors.

Fire Stopping London is run by a small fire safety team that has worked in fire and security since 2010. We take on fire stopping and compartmentation work across Greater London, from one plant room ceiling to a tower with a riser on every landing.

The sealing in London is carried out by our BM TRADA / FIRAS-certificated contractors, who cover the whole city and the towns round it. We price each job, plan the access and the order of floors, and stay the one point of contact from the first photo you send to the final schedule.

A metal grille set into a blockwork wall below a concrete slab, with steel pipes and rods in front
A metal grille set into a blockwork wall below a concrete slab, with steel pipes and rods in front

Fire stopping we have done

A health club plant room, where the main cables through the ceiling had been packed with red fire foam. The foam came out and the openings were closed with batt and mastic.

A school block.

A gas meter cupboard in a block of flats.

64 openings in a block of flats, put right after a fire risk assessment listed them.

A compartmentation survey at a hotel.

We do not name clients or give addresses.

Where we stop

A fire risk assessment and a fire door inspection are separate services from fire stopping, and this work does not cover either of them. We will not call a seal compliant when nobody can show what it is, or fit a product outside the way it was tested.

Holes in a fire wall or floor?

Send the postcode, the type of building and a photo with a tape measure in it. We will come back with what it needs and a rough price.

Call 020 7870 2772Get a quote