Fire stopping in the City of London

Office floors change tenants often. The walls between them keep getting new holes.

  • Every seal labelled and photographed
  • BM TRADA / FIRAS-certificated contractors
  • Written price before any work
Get a price

We reply with a written price.

We use these details to reply to you. See our privacy notice.

Most of the fire stopping we get asked about in the Square Mile comes after a fit-out.

A tenant moves in, the floor is stripped to the slab, and new partitions, power and data go in. Then, a few years later, the next tenant does it again. Each time, cables and pipes are pulled through the fire-resisting walls round the cores and the risers. Somebody is meant to seal behind them. Often the last trade out of the ceiling just puts the tiles back.

A red pipe running over a cable tray and a bank of purple data cables in a ceiling void
A red pipe running over a cable tray and a bank of purple data cables in a ceiling void

What we usually find above the ceiling

Cable trays running through the core wall with the old seal cut away to make room.

Bundles of data cable added to a seal that was sized for half as many, with the new ones simply pushed through the batt.

A row of open holes along the wall head where an old tray was taken out and not replaced.

Copper pipes for a new tea point, through a stud partition that is part of the escape route.

Fit-out timing

If you are the landlord's building manager or the fit-out contractor, the easiest point to put this right is before the ceiling grid goes back. Once the tiles are in and the tenant has moved, every seal needs a tile lifted and a ladder under it, often out of hours.

Homes in the City

The City is not only offices. There are residential blocks too, the Barbican estate among them, with the same kind of service risers as any block of flats elsewhere in London. In listed buildings, ask the City of London Corporation about consent before anyone cuts a new inspection hole.

Work and price

Sealing is carried out by our BM TRADA / FIRAS-certificated contractors. Jobs usually start at around £2,000 plus VAT, and a survey of a floor or a whole building is priced once we have seen the drawings.