Fire stopping in Barnet
A borough of new blocks in the south and suburban streets in the north.
- Every seal labelled and photographed
- BM TRADA / FIRAS-certificated contractors
- Written price before any work
Barnet is one of the biggest boroughs in London, and the buildings change a lot from one end to the other.
Colindale has seen thousands of new flats built in the last twenty years. Grahame Park, the large estate next door, is part way through being rebuilt. Further north, Finchley, Barnet and Edgware are mostly streets of houses, some split into flats, with care homes and schools among them.

New blocks in phases
Where an estate is rebuilt in phases, one building is finished and lived in while the next is still going up. That is when fire stopping in the finished block gets disturbed. A new cable is run through from the next phase, or a service is diverted, and the seal it passes through is not put back.
If you manage one of these blocks, ask for the seal schedule from the original contractor. If there is one, we can check the risers against it. If there is not, a survey gives you one.
Care homes
Residents in a care home may not be able to leave quickly, so compartments are planned round moving people sideways into the next section. That only works if the walls between sections hold. Ceiling voids over corridors are where we look first, because that is where nurse call, data and heating pipes have been added over the years.
Work in a care home is arranged round the routine of the home. We agree times with the manager, and nothing is left open overnight.
Houses split into flats
A meter cupboard under the stairs, a floor between two flats, a loft over both. Small jobs on their own, but the price usually starts at around £2,000 plus VAT, so it helps to do a whole building at once.
The sealing is done by our BM TRADA / FIRAS-certificated contractors.
Send the postcode, the type of building and a photo with a tape measure in it. We will come back with what it needs and a rough price.