Installation starts from a list of breaches, from our survey, someone else's, or a fire risk assessment that names the risers where the floors are open.

A square galvanised duct passing through a coated batt panel in a blockwork wall
A square galvanised duct passing through a coated batt panel in a blockwork wall

What comes out first

Builder's foam, rag, newspaper, cardboard, loose rockwool with no coating, cracked mortar round a plastic pipe. They get removed and bagged before the new seal goes in, because a seal fitted over rubbish is not a tested seal.

What goes in

A 110mm plastic soil stack through a slab gets a 110mm intumescent collar on the underside, fixed with four steel anchors. Copper pipes get mineral wool packed into the hole and intumescent mastic over it. A cable tray gets coated batt cut to the opening, with mastic worked round every cable and along every cut edge.

Three seals, three labels: 3F-01, 3F-02, 3F-03. Each label shows the product, the 60 minute rating, the installer and the date. A photo of each is taken with the label in the frame. The schedule line for the tray reads: 3F-03, riser 1, floor 3, cable tray approx 30 cables, coated batt and mastic, 60 min, photo 3F-03.

Where cables are going to keep changing, for instance a riser that carries broadband for every flat, the contractor may fit pillows or a resealable compound in place of batt, so an engineer can add a cable later and close the seal behind it.

Every product is fitted the way its fire test was done. A collar tested on the underside of a slab goes on the underside. A mastic tested at 15mm deep goes in at 15mm.

The work is carried out by our BM TRADA / FIRAS-certificated contractors. Drilling for collar anchors is loud for a few minutes, so we agree times with the building manager.