Fire collars and pipe wraps
Plastic pipes melt in a fire and leave a hole. A collar closes it.
- Every seal labelled and photographed
- BM TRADA / FIRAS-certificated contractors
- Written price before any work
A plastic pipe through a floor is fine until it gets hot. Then it softens, sags and burns away, and the hole it ran through is open from one flat to the next.
A collar is a steel or plastic ring lined with intumescent material. In heat the lining swells hard and squeezes the softening pipe shut. A wrap does the same job as a strip wound round the pipe and pushed into the opening.

Sizes and fixings
Collars are made for set pipe sizes. A 110mm soil stack takes a 110mm collar, a 40mm waste takes a 40mm one. Close enough is not good enough, because a collar that is too big leaves the pipe room to fall away before the lining closes.
The fixing matters as much as the collar. On a concrete slab the collar is usually fixed to the underside with steel anchors. On a drywall partition it may need a collar on each face, through-bolted. The maker's data sheet says which, and the contractor follows it.
Where we usually find them missing
Soil stacks in risers where the pipe was replaced and the old collar was thrown away.
Waste pipes from kitchens and bathrooms that drop through the floor into a ceiling void below.
Condensate pipes from air conditioning units, small and easy to miss, run through walls by an installer who was thinking about the drain, not the wall.
Push-fit water pipes run in plastic through blockwork during a refurbishment.
Metal pipes are different
A copper or steel pipe does not melt away, so it does not need a collar. It conducts heat instead, so it may need lagging along part of its length and a seal round it. The data sheet for the sealing system sets the length.
Fitted and recorded
Each collar or wrap gets a label beside it and a photo. Collars are fitted by our BM TRADA / FIRAS-certificated contractors, and they end up on the same schedule as every other seal in the building.
Send the postcode, the type of building and a photo with a tape measure in it. We will come back with what it needs and a rough price.